Footwear Outsoles · Materials · OEM/ODM

WENCHANGFOOTWEAR MATERIALS Request a Quote

Verified TPR Rotary-Disk Injection Moulding Capability

Jinjiang WENCHANG Footwear Materials Co., Ltd. Uses three sets of TPR rotary-disk injection machines to support TPR outsole production for footwear project buyers. WENCHANG produces footwear outsoles and also supplies shoemaking accessories and finished footwear to brands, importers, distributors and footwear factories.

TPR outsole mould and formed outsole beside rotary-disk injection equipment in a clean factory setting

Process Scope

What Our TPR Injection Capability Covers

TPR rotary-disk injection moulding is the specific capability covered here. TPR means thermoplastic rubber, the verified material connected to these machines and process. The route covers mould development, material readiness, injection, cooling forming, trimming, quality inspection and packaging for defined TPR outsole projects.

02

TPR Material Readiness

03

Injection

04

Cooling Forming

05

Trimming

06

Quality Inspection

Equipment Evidence

Verified Equipment for TPR Outsole Injection

WENCHANG has three sets of TPR rotary-disk injection machines. They support TPR injection and cooling-forming stages, but no separate function or production rating is assigned to each machine. Technical specifications are reviewed according to the project need.

Equipment Type

TPR rotary-disk injection machines linked specifically to TPR outsole production.

Available Quantity

Three sets are available. Individual machine roles are not stated.

Process Relationship

The machines support injection and cooling forming, not trimming, inspection or packaging.

Technical Specifications

Project review covers the required specifications. No brand, model, pressure, temperature, cycle time or output rating is claimed here.

TPR outsole mould and material sample arranged on a clean factory inspection bench

Project Readiness

Mould and TPR Material Readiness Before Injection

Injection begins after the relevant mould route and TPR material have been identified. Mould development is the first named stage, while detailed tooling engineering remains a separate capability. Existing moulds, new moulds and other tooling routes require project assessment.

Quality Handoff

Inspection Handoff After Trimming

Quality inspection takes place after trimming and before packaging. WENCHANG’s wider quality-control framework includes incoming material inspection, first-article review, in-process checks and final inspection. Project-specific criteria and required physical or chemical tests must be reviewed separately.

Incoming Material Inspection:

A control point for materials entering the production route.

First-Article Review:

An early review point before continued production.

In-Process Checks:

Checks carried out while production work is in progress.

Final Inspection:

An inspection point for completed products.

Final Process Stage

Packaging Marks the End of the Named Production Route

Packaging is the final stage in the verified TPR injection sequence, following quality inspection. It is separate from the rotary-disk machines, whose role is connected to injection and forming. Packing materials, custom boxes, transport methods and trade terms require separate project and logistics review.

FAQ

Frequently Asked Questions

Wenchang uses TPR rotary-disk injection machines to support the injection and forming stages of TPR outsole production. The confirmed equipment description does not include machine brands, model numbers, automation levels or technical ratings.
Jinjiang Wenchang Footwear Materials Co., Ltd. has three sets of TPR rotary-disk injection machines. This figure confirms the available equipment quantity but does not represent an output rate, cycle time or project delivery promise.
The verified sequence is mould development, material, injection, cooling forming, trimming, quality inspection and packaging. The rotary-disk machines support injection and forming, while the other stages are separate parts of the wider TPR outsole workflow.
Trimming follows cooling forming. The trimmed outsole then moves to quality inspection before packaging. Inspection criteria must be based on the project specification and cannot be inferred from the equipment type alone.
No. The confirmed relationship applies to TPR and TPR outsole production. It does not confirm that RB rubber, MD Phylon, PU or ETPU combined outsoles use these machines or follow the same injection process.
Provide the product type, artwork or reference, quantity, size run, TPR material or process requirement, colour, mould status, packaging, destination, required schedule and any testing requirements. These details allow the equipment and production route to be reviewed against a defined project.
Review Your TPR Outsole Requirement shown for WENCHANG footwear and footwear materials product sourcing in Review Your TPR

Next Project Step

Review Your TPR Outsole Requirement

If your project requires TPR outsole injection, send the product brief and identify the relevant mould route. WENCHANG can then review how the requirement relates to three TPR rotary-disk injection machines and the confirmed production sequence.

Scroll to Top
WENCHANG
FOOTWEAR & MATERIALS

Built Around Your Next Footwear Project

From outsole development to finished footwear, start with a clear brief and a practical conversation.

Outsole Development

Materials, moulds and sampling.

Shoemaking Accessories

Components for your specification.

Finished Footwear

OEM, ODM and sourcing enquiries.

PROJECT ENQUIRY

Tell Us What You Need

Share your requirements for a quotation or technical discussion. Fields marked * are required.
Your details are used to respond to this enquiry. Read our Privacy Policy.